Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

1 December 2010

Time:

09:00

Inspection No.:

081

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The dusty material on the ground at Wall 4-7 had been dampened. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

General refuse and C&D materials were observed inside the u-channel at TP7. The Contractor was reminded to remove the general refuse and C&D materials from the u-channel and properly maintain the drainage system on-site.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

2 December 2010

Time:

14:00

Inspection No.:

082

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

Stagnant water and silt inside the tray next to the sedimentation tank at Bridge 12A had been cleared. (Closed)

 

 

2.

The site inspection did not cover the area at Lam Kam Flyover. The status of drip tray for the oil drum underneath Lam Kam Flyover is to be inspected. (Follow-up)

 

 

3.

The site inspection did not cover the area at Lam Kam Flyover. The status of the uncovered stockpiles underneath Lam Kam Flyover is to be inspected. (Follow-up)

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

7 December 2010

Time:

14:00

Inspection No.:

083

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The general refuse and C&D materials inside the u-channel at TP7 had been cleared. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observations

 

2.

The stock of cement bags near the vehicle site entrance of Wall 8 was not covered. The Contractor was reminded to cover the stock of cement bags with tarpaulin sheets.

3.

An air compressor at bridge level of Wall 8 was not fitted with noise emission label. The Contractor was reminded to fit proper noise emission label at obvious location on the air compressor.

 

 

4.

Oil stains were observed near the drip tray of chemical containers at bridge level of Wall 8. While no leakage from the tray or chemical containers was observed, the Contractor was reminded to properly handle the chemicals and to clean up the oil stains.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

9 December 2010

Time:

14:00

Inspection No.:

084

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

The oil drum underneath Lam Kam Flyover had been removed. (Closed)

 

 

2.

All the stockpiles underneath Lam Kam Flyover had been covered with impervious sheets. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

3.

Excavated materials and non-inert C&D waste were accumulated near the sump pit at W73. The Contractor was reminded to keep excavated materials and C&D waste away from the sump pit and dispose of the waste in a timely manner.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

15 December 2010

Time:

14:00

Inspection No.:

086

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The stock of cement bags near the vehicle site entrance of Wall 8 had been covered by tarpaulin. (Closed)

 

 

2.

Noise emission label had been fitted on the air compressor on the bridge deck of Wall 8. (Closed)

 

3.

 

The oil stains near the drip tray of chemical containers at bridge deck of Wall 8 had been cleared. (Closed)

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

15 December 2010

Time:

09:00

Inspection No.:

085

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

The non-inert C&D waste and excavated materials near the sump pit at W73 had been cleared. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

A drip tray of chemical containers at Gate 30 was filled with silt. The Contractor was advised to clear the silt and prevent silt from getting into drip trays.

3.

The u-channel on the slope at Gate 30 was blocked by silt and felled trees. The Contractor was advised to clear the silt and remove the felled trees from the u-channel.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

22 December 2010

Time:

09:00

Inspection No.:

087

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

C&D materials were placed very close to the retained trees at Retaining Wall 10. The Contractor was reminded to keep all construction materials away from the retained trees.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

23 December 2010

Time:

14:00

Inspection No.:

088

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

The silt inside the drip tray of chemical containers at Gate 30 had been cleared. (Closed)

 

 

2.

The silt and felled trees inside the u-channel at Gate 30 had been cleared away from the u-channel. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

29 December 2010

Time:

09:00

Inspection No.:

089

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

C&D materials were observed to have been kept away from the retained trees at Retaining Wall 10. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

29 December 2010

Time:

14:00

Inspection No.:

090

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Dusty material was observed on the ground at Area C. The Contractor was reminded to clear the dusty material and properly handle them in the future.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil