Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
3 November 2010 |
Time: |
09:00 |
Inspection No.: |
073 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
Bunding
was missing on the temporary bridge at Bridge 11A. The Contractor was
reminded to provide bunding at both sides of the bridge. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
3 November 2010 |
Time: |
14:00 |
Inspection No.: |
074 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
The generator at Area 25 at Tai Wo Road had
been removed off-site. (Closed) |
|
|
2. |
No cement powder
was observed on ground at W72B. (Closed) |
|
|
3. |
The
cement bags which were just used at the grouting station at Lam Kam Flyover
Pier 3 had been dampened and were scheduled to be disposed of daily. (Closed) |
|
|
|
|
|
|
|
New
Observation |
4. |
Fugitive
dust was observed when dump trucks passed through the haul road at Area B.
The Contractor was reminded to provide dust suppression measures at the Area. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
10 November 2010 |
Time: |
14:00 |
Inspection No.: |
075 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Water truck was deployed to dampen the haul
road at Area B. No significant fugitive dust was observed. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
11 November 2010 |
Time: |
14:00 |
Inspection No.: |
076 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Sand bag bunding had been provided at both
sides of the temporary bridge at Bridge 11A. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
Stagnant
water was observed inside a pile cap at Wall 8. The Contractor was reminded
to clear the stagnant water. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
17 November 2010 |
Time: |
09:30 |
Inspection No.: |
077 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
The stagnant water inside the pile cap at
Wall 8 had been removed. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
18 November 2010 |
Time: |
14:00 |
Inspection No.: |
078 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
Accumulation
of silt and stagnant water was observed in the tray next to the sedimentation
tank at Bridge 12A. The Contractor was reminded to clear the silt and
stagnant water in the tray regularly. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
25 November 2010 |
Time: |
09:00 |
Inspection No.: |
079 |
|
Nil |
|
Follow
Up Observation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
Cement
powder was observed on the ground at Wall 4-7. The Contractor was reminded to
clear the cement powder. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
25 November 2010 |
Time: |
14:00 |
Inspection No.: |
080 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
The site inspection did not cover the area
at Bridge 12A. The status of the tray accumulated with silt next to the
sedimentation tank at Bridge 12A is to be inspected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observations |
2. |
An
oil drum was placed on ground without drip tray underneath Lam Kam Flyover.
The Contractor was reminded to provide drip tray to all chemical containers
on site. |
3. |
Two
stockpiles were not covered underneath Lam Kam Flyover. The Contractor was
reminded to cover the stockpiles with impervious sheets. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |