Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

3 November 2010

Time:

09:00

Inspection No.:

073

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Bunding was missing on the temporary bridge at Bridge 11A. The Contractor was reminded to provide bunding at both sides of the bridge.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

3 November 2010

Time:

14:00

Inspection No.:

074

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

The generator at Area 25 at Tai Wo Road had been removed off-site. (Closed)

 

 

2.

No cement powder was observed on ground at W72B. (Closed)

 

 

3.

The cement bags which were just used at the grouting station at Lam Kam Flyover Pier 3 had been dampened and were scheduled to be disposed of daily. (Closed)

 

 

 

 

 

 

 

 

 

New Observation

 

4.

Fugitive dust was observed when dump trucks passed through the haul road at Area B. The Contractor was reminded to provide dust suppression measures at the Area.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

10 November 2010

Time:

14:00

Inspection No.:

075

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Water truck was deployed to dampen the haul road at Area B. No significant fugitive dust was observed. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

11 November 2010

Time:

14:00

Inspection No.:

076

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Sand bag bunding had been provided at both sides of the temporary bridge at Bridge 11A. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Stagnant water was observed inside a pile cap at Wall 8. The Contractor was reminded to clear the stagnant water.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

17 November 2010

Time:

09:30

Inspection No.:

077

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The stagnant water inside the pile cap at Wall 8 had been removed. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

18 November 2010

Time:

14:00

Inspection No.:

078

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Accumulation of silt and stagnant water was observed in the tray next to the sedimentation tank at Bridge 12A. The Contractor was reminded to clear the silt and stagnant water in the tray regularly.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

25 November 2010

Time:

09:00

Inspection No.:

079

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Cement powder was observed on the ground at Wall 4-7. The Contractor was reminded to clear the cement powder.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

25 November 2010

Time:

14:00

Inspection No.:

080

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The site inspection did not cover the area at Bridge 12A. The status of the tray accumulated with silt next to the sedimentation tank at Bridge 12A is to be inspected.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observations

 

2.

An oil drum was placed on ground without drip tray underneath Lam Kam Flyover. The Contractor was reminded to provide drip tray to all chemical containers on site.

3.

Two stockpiles were not covered underneath Lam Kam Flyover. The Contractor was reminded to cover the stockpiles with impervious sheets.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil