Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
6 October 2010 |
Time: |
14:00 |
Inspection No.: |
065 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
7 October 2010 |
Time: |
14:00 |
Inspection No.: |
066 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
The site inspection did not cover the area
at Bridge 12A. The condition of excavated mud and the drip trays are to be
inspected. |
|
|
2. |
The site
inspection did not cover the area at Bridge 12A. The condition of noise
emission of the air compressor is to be inspected. |
|
|
3. |
The
site inspection did not cover the area at Bridge 12A. The condition of
stockpile of mud is to be inspected. |
|
|
4. |
The
site inspection did not cover W73. The condition of vehicle washing at W73 is
to be inspected. |
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
13 October 2010 |
Time: |
14:00 |
Inspection No.: |
067 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
Excavated mud inside the drip tray
underneath the air compressor at Bridge 12A P1 had been removed. (Closed) |
|
|
2. |
Noise emission
label of the air compressor at Bridge 12A P1 had been attached at obvious
location on the equipment. (Closed) |
|
|
3. |
The
stockpile of mud at Bridge 12A P1 next to the u-channel had been fully
covered. (Closed) |
|
|
4. |
Vehicle
wheel washing with high pressure jet had been provided at W73 site entrance.
(Closed) |
|
|
|
New
Observation |
5. |
The
flap of a crane was opened during operation at Bridge 12A P1. The Contractor
was reminded to close the flaps of the mechanical equipments during
operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
14 October 2010 |
Time: |
14:00 |
Inspection No.: |
068 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
An
oil drum was observed placed on ground without drip tray at Bridge 10A. The
Contractor was reminded to provide drip tray to all chemical containers on
site. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
21 October 2010 |
Time: |
09:00 |
Inspection No.: |
069 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
The oil drum without drip tray at Bridge
10A had been removed. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
|
Name |
Signature |
Date |
Prepared by |
Ryan Wong |
|
22
October 2010 |
Checked by |
Edith
Ng |
|
22
October 2010 |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
21 October 2010 |
Time: |
14:00 |
Inspection No.: |
070 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
The piling crane with the flap opened at
Bridge 12A P2 had been removed. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
2. |
Oil
stain was observed on ground next to the drip tray of a generator at Area 25
near Tai Wo Road. The Contractor was advised to provide a large drip tray to
the generator. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 (Between Island House
Interchange and Ma Wo) |
Date: |
27 October 2010 |
Time: |
09:00 |
Inspection No.: |
071 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 (Between Ma Wo and Tai Hang) |
Date: |
28 October 2010 |
Time: |
14:00 |
Inspection No.: |
072 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
The site inspection did not cover the area
at Tai Wo Road. The condition of the drip tray of the generator at Area 25 is
to be inspected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observations |
2. |
Cement
powder was scattered on the ground at W72B. The Contractor was requested to
clean up the cement powder. |
3. |
Empty
cement bags were accumulated next to the grouting station at Lam Kam Flyover
Pier 3. The Contractor was advised to dispose of the empty cement bags
properly. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |