Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

4 August 2010

Time:

09:00

Inspection No.:

047

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Construction materials were scattered on the slope facing the MTR rail and general refuse was mixed with C&D materials at Lam Kam Bridge area. The Contractor was reminded to sort the C&D materials and maintain housekeeping on site properly.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

5 August 2010

Time:

14:00

Inspection No.:

048

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

Bunding had been provided at both sides and the holes had been sealed on the temporary bridge leading to Bridge 12B. (Closed)

 

 

2.

The water discharged at the site entrance of Bridge 12A was clear. (Closed)

 

 

3.

Stagnant water inside the drip tray underneath the air compressor at Bridge 12A had been cleared. (Closed)

 

 

 

 

 

 

 

New Observation

 

4.

A chemical container at Slope 37 was placed on ground without drip tray. The Contractor was reminded to provide drip tray to all chemicals on site.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

11 August 2010

Time:

14:00

Inspection No.:

049

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The chemical container at S37 had been removed. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

Noise emission label was missing on two air compressors at Lam Kam Flyover Pier 3. The Contractor was reminded to fit noise labels on the air compressors.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

12 August 2010

Time:

14:00

Inspection No.:

050

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The general refuse at Lam Kam Bridge area had been cleared and proper housekeeping had been maintained. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Stagnant water was observed inside a drip tray under a generator at Lam Kam Bridge area. The Contractor was reminded to clear the stagnant water.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

18 August 2010

Time:

09:00

Inspection No.:

051

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Stagnant water inside the drip tray at Lam Kam Bridge area had been removed. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

19 August 2010

Time:

14:00

Inspection No.:

052

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Noise emission label had been fitted on the air compressors at Lam Kam Flyover Pier 3. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

Electric wires were found tied onto retained trees and a metal bar was found stuck on the retained trees at Tai Wo Road Gate 3. The Contractor was reminded not to tie electric wires on retained trees nor use them as physical support. The Contractor was also advised to wrap the trunks of the easily accessible retained trees with hessian for protection.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09 (Between Island House Interchange and Ma Wo)

Date:

25 August 2010

Time:

14:00

Inspection No.:

053

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08 (Between Ma Wo and Tai Hang)

Date:

26 August 2010

Time:

14:00

Inspection No.:

054

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Electric wires and metal bars had been kept away from the retained trees at Tai Wo Road Gate 3. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

A chemical container and an empty oil drum were placed on ground without drip tray at S30A. The Contractor was reminded to provide drip trays to all chemicals and remove the empty oil drum on site.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil