Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09

Date:

2 June 2010

Time:

09:00

Inspection No.:

029

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 




Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08

Date:

3 June 2010

Time:

14:00

Inspection No.:

030

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The stagnant water near the concrete mixing area at Bridge 12 had been removed. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08

Date:

9 June 2010

Time:

14:00

Inspection No.:

031

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

A chemical container together with the drip tray was placed on top of the u-channel at Bridge 12. The Contractor was reminded to keep all chemicals away from the drainage system.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09

Date:

10 June 2010

Time:

14:00

Inspection No.:

032

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09

Date:

17 June 2010

Time:

09:00

Inspection No.:

033

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

1.

Excessive smoke emission was observed from an excavator at W1 at Banyan Bridge. The Contractor was reminded to properly maintain the plants on site.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08

Date:

17 June 2010

Time:

14:00

Inspection No.:

034

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

Chemical containers had been kept away from the u-channel at Bridge 12. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


 

Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09

Date:

24 June 2010

Time:

09:00

Inspection No.:

035

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

No unacceptable smoke emission was observed from the plants at Banyan Bridge. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

2.

Display of Environmental Permit is missing at the site entrance at TP7. The Contractor was reminded to post the EP at all the site entrances.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08

Date:

24 June 2010

Time:

14:00

Inspection No.:

036

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observations

 

1.

A chemical container was found placed inside a 610-diameter pile casing at Lam Kam Flyover. The Contractor was requested to properly place all chemicals with drip tray.

2.

An electric wire was observed hung on the branch of a retained tree at Lam Kam Flyover. The Contractor was reminded not to hang anything on the trees that have to be retained.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09

Date:

30 June 2010

Time:

09:00

Inspection No.:

037

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

EP had been posted at the site entrance at TP7. (Closed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Observations

 

2.

Silt was accumulated inside the u-channel at Wall 8. The Contractor was reminded to clear the silt more frequently, especially during rainy seasons.

3,

A portion of perimeter u-channel or bunding was missing at Wall 8. The Contractor was reminded to provide u-channel or bunding at that section.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2009/08

Date:

30 June 2010

Time:

14:00

Inspection No.:

038

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

All chemical containers had been placed on ground properly with drip trays. (Closed)

 

 

2.

The electric wire had been kept away from the retained tree at Lam Kam Flyover. (Closed)

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil