Site
Inspection Summary
Contract No. |
HY/2008/09 |
Date: |
2 June 2010 |
Time: |
09:00 |
Inspection No.: |
029 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 |
Date: |
3 June 2010 |
Time: |
14:00 |
Inspection No.: |
030 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
The stagnant water near the concrete mixing
area at Bridge 12 had been removed. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 |
Date: |
9 June 2010 |
Time: |
14:00 |
Inspection No.: |
031 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
A
chemical container together with the drip tray was placed on top of the
u-channel at Bridge 12. The Contractor was reminded to keep all chemicals
away from the drainage system. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 |
Date: |
10 June 2010 |
Time: |
14:00 |
Inspection No.: |
032 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 |
Date: |
17 June 2010 |
Time: |
09:00 |
Inspection No.: |
033 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
1. |
Excessive
smoke emission was observed from an excavator at W1 at Banyan Bridge. The
Contractor was reminded to properly maintain the plants on site. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 |
Date: |
17 June 2010 |
Time: |
14:00 |
Inspection No.: |
034 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
Chemical containers had been kept away from
the u-channel at Bridge 12. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 |
Date: |
24 June 2010 |
Time: |
09:00 |
Inspection No.: |
035 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
No unacceptable smoke emission was observed
from the plants at Banyan Bridge. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
2. |
Display
of Environmental Permit is missing at the site entrance at TP7. The Contractor
was reminded to post the EP at all the site entrances. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 |
Date: |
24 June 2010 |
Time: |
14:00 |
Inspection No.: |
036 |
|
Nil |
|
Follow
Up Observation |
|
|
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observations |
1. |
A
chemical container was found placed inside a 610-diameter pile casing at Lam
Kam Flyover. The Contractor was requested to properly place all chemicals
with drip tray. |
2. |
An
electric wire was observed hung on the branch of a retained tree at Lam Kam
Flyover. The Contractor was reminded not to hang anything on the trees that
have to be retained. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 |
Date: |
30 June 2010 |
Time: |
09:00 |
Inspection No.: |
037 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
EP had been posted at the site entrance at
TP7. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
New
Observations |
2. |
Silt
was accumulated inside the u-channel at Wall 8. The Contractor was reminded
to clear the silt more frequently, especially during rainy seasons. |
3, |
A
portion of perimeter u-channel or bunding was missing at Wall 8. The
Contractor was reminded to provide u-channel or bunding at that section. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2009/08 |
Date: |
30 June 2010 |
Time: |
14:00 |
Inspection No.: |
038 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
All chemical containers had been placed on
ground properly with drip trays. (Closed) |
|
|
2. |
The
electric wire had been kept away from the retained tree at Lam Kam Flyover.
(Closed) |
|
|
|
|
|
|
|
|
|
|
|
New
Observation |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|