Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09

Date:

7 April 2010

Time:

14:00

Inspection No.:

020

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

1.

Small amount of oil seepage was observed underneath an idle excavator at Banyan Bridge. The Contractor was reminded to provide a tarpaulin sheets underneath the excavator and remove the contaminated soil as chemical waste.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09

Date:

14 April 2010

Time:

09:00

Inspection No.:

021

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The excavator at Banyan Bridge had been repaired and the oil stains had been removed. However, oil seepage was observed underneath a crawler crane at Bridge 10A. The Contractor was reminded to clear the oil stains and properly maintain the machineries on site.

 

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

2.

Two chemical containers at Wall 10 were observed without chemical label. The Contractor was reminded to provide chemical labels to all chemicals on site.

 

 

3

A few oil containers were placed on ground without drip tray at Wall 14 and at Bridge 11A. The Contractor was reminded to provide drip tray to all chemicals on site.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09

Date:

20 April 2010

Time:

09:00

Inspection No.:

022

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

The crawler crane at Bridge 10A had been repaired and no oil stain was observed on ground. (Closed)

 

 

2.

The chemical containers at Wall 10 had been removed. (Closed)

 

 

3

The oil containers at Wall 14 and Bridge 11A had been provided with drip trays. (Closed)

 

 

 

 

 

 

 

New Observations

 

4.

Moderate noise level was generated during the concrete breaking activity at Bridge 10A. The Contractor was recommended to wrap the breaker tip with sound insulation material.

5.

The water in Tai Po River outside Wall 10 was muddy. The Contractor was requested to investigate the cause of the muddy water and suspend the work of the possible source immediately.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09

Date:

28 April 2010

Time:

09:00

Inspection No.:

023

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

The concrete breaking work at Bridge 10A had been completed. (Closed)

 

 

2.

The water in Tai Po River was observed clear and an investigation report for the muddy water incident at the last inspection had been submitted. (Closed)

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

3.

One of the fencings for protecting the retained trees was broken at Banyan Bridge. The Contractor was reminded to fix the fencing.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil