Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09

Date:

3 March 2010

Time:

9:00

Inspection No.:

015

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The silt inside the u-channel at Bridge 10A pier 2 had been cleared. (Closed)

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

2

An oil drum was found placed on ground without drip tray. The Contractor was reminded to provide drip tray to all chemicals containers on site.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09

Date:

10 March 2010

Time:

14:30

Inspection No.:

016

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The oil drum at Bridge 10A was still placed on ground without drip tray. Also a chemical container at Tat Wan Road Slope 13 was found without label and drip tray. The Contractor was reminded to provide chemical label and drip tray to all chemicals on site.

 

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

2

Environmental Permit was not observed posted at the site entrance of Bridge 10A. The Contractor was reminded to post a copy of EP at all site entrances.

 

 

3.

A few stockpile of fine sediment was not properly covered at Bridge 10A. The Contractor was reminded to cover the stockpile with tarpaulin sheets.

 

 

4.

The drip tray underneath a water pump at Tat Wan Road was full. The Contractor was reminded to remove the content inside the drip tray.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09

Date:

17 March 2010

Time:

09:00

Inspection No.:

017

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

Drip trays had been provided to the oil drums at Bridge 10A and at Tat Wan Road. (Closed)

 

 

2.

EP had been posted at the site entrance of Bridge 10A. (Closed)

 

 

3.

The stockpile of sediment at Bridge 10A had been properly covered. (Closed)

 

 

4.

The content inside the drip tray underneath a water pump at Tat Wan Road had been removed. (Closed)

 

 

 

 

 

 

 

New Observation

 

 

5.

Stagnant water was observed at the wheel washing bay at Banyan Bridge. The Contractor was reminded to clear the stagnant water or to spray larvicide to the water.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09

Date:

24 March 2010

Time:

09:00

Inspection No.:

018

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The stagnant water at the wheel washing bay at Banyan Bridge had been cleared. (Closed)

 

 

 

 

 

 

 

New Observations

 

 

2.

A stockpile of sediment near the site entrance at Bridge 10A was not covered. The Contractor was reminded to cover the stockpile with tarpaulin sheet.

 

 

 

 

3.

Stagnant water was observed near the sedimentation tanks at Bridge 10A. The Contractor was

reminded to clear the stagnant water.

4.

Silt was observed accumulated inside the u-channel at Bridge 10A pier 2. The Contractor was reminded to clear the silt inside u-channels regularly.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Contract No.

HY/2008/09

Date:

31 March 2010

Time:

09:00

Inspection No.:

019

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

The stockpile of soil near the site entrance at Bridge 10A had been removed. (Closed)

 

 

2.

The stagnant water near the sedimentation tanks at Bridge 10A had been cleared. (Closed)

 

 

3.

The silt inside the u-channel at Bridge 10A pier 2 had been cleared. (Closed)

 

 

 

 

 

 

 

New Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil