Site
Inspection Summary
Contract No. |
HY/2008/09 |
Date: |
3 March 2010 |
Time: |
9:00 |
Inspection No.: |
015 |
|
Nil |
|
Follow Up Observation |
|
|
1. |
The silt inside the u-channel at Bridge 10A
pier 2 had been cleared. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
New Observation |
|
|
2 |
An
oil drum was found placed on ground without drip tray. The Contractor was
reminded to provide drip tray to all chemicals containers on site. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 |
Date: |
10 March 2010 |
Time: |
14:30 |
Inspection No.: |
016 |
|
Nil |
|
Follow Up Observation |
|
|
1. |
The oil drum at Bridge 10A was still placed
on ground without drip tray. Also a chemical container at Tat Wan Road Slope
13 was found without label and drip tray. The Contractor was reminded to
provide chemical label and drip tray to all chemicals on site. |
|
|
|
|
|
|
|
|
|
|
|
New Observations |
|
|
2 |
Environmental
Permit was not observed posted at the site entrance of Bridge 10A. The
Contractor was reminded to post a copy of EP at all site entrances. |
|
|
3. |
A
few stockpile of fine sediment was not properly covered at Bridge 10A. The
Contractor was reminded to cover the stockpile with tarpaulin sheets. |
|
|
4. |
The
drip tray underneath a water pump at Tat Wan Road was full. The Contractor
was reminded to remove the content inside the drip tray. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 |
Date: |
17 March 2010 |
Time: |
09:00 |
Inspection No.: |
017 |
|
Nil |
|
Follow Up Observations |
|
|
1. |
Drip trays had been provided to the oil
drums at Bridge 10A and at Tat Wan Road. (Closed) |
|
|
2. |
EP
had been posted at the site entrance of Bridge 10A. (Closed) |
|
|
3. |
The stockpile of sediment at Bridge
10A had been properly covered. (Closed) |
|
|
4. |
The
content inside the drip tray underneath a water pump at Tat Wan Road had been
removed. (Closed) |
|
|
|
|
|
|
|
New Observation |
|
|
5. |
Stagnant
water was observed at the wheel washing bay at Banyan Bridge. The Contractor
was reminded to clear the stagnant water or to spray larvicide to the water. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 |
Date: |
24 March 2010 |
Time: |
09:00 |
Inspection No.: |
018 |
|
Nil |
|
Follow
Up Observation |
|
|
1. |
The stagnant water at the wheel washing bay
at Banyan Bridge had been cleared. (Closed) |
|
|
|
|
|
|
|
New
Observations |
|
|
2. |
A
stockpile of sediment near the site entrance at Bridge 10A was not covered.
The Contractor was reminded to cover the stockpile with tarpaulin sheet. |
|
|
|
|
3. |
Stagnant
water was observed near the sedimentation tanks at Bridge 10A. The Contractor
was reminded
to clear the stagnant water. |
4. |
Silt
was observed accumulated inside the u-channel at Bridge 10A pier 2. The
Contractor was reminded to clear the silt inside u-channels regularly. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Contract No. |
HY/2008/09 |
Date: |
31 March 2010 |
Time: |
09:00 |
Inspection No.: |
019 |
|
Nil |
|
Follow
Up Observations |
|
|
1. |
The stockpile of soil near the site
entrance at Bridge 10A had been removed. (Closed) |
|
|
2. |
The
stagnant water near the sedimentation tanks at Bridge 10A had been cleared.
(Closed) |
|
|
3. |
The
silt inside the u-channel at Bridge 10A pier 2 had been cleared. (Closed) |
|
|
|
|
|
|
|
New
Observation |
|
|
|
Nil |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |