Site Inspection Summary

 

Inspection Information

Date:

3 February 2010

Time:

09:00

Inspection No.:

011

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

1.

A stockpile of stonefine was not properly covered at Wall 8. The Contractor was reminded to cover the stockpile with tarpaulin sheet.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Date:

11 February 2010

Time:

14:00

Inspection No.:

012

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The stockpile of stonefine at Wall 8 had been covered with tarpaulin. (Closed)

 

 

 

 

 

 

 

 

 

 

 

New Observations

 

 

2.

A hole was observed on the drip tray underneath an oil drum at Banyan Bridge. The Contractor was reminded to seal off the hole.

 

 

3.

Oil stains were observed on the top soil layer on the ground at Banyan Bridge. The Contractor was reminded to clear the oily soil and treat it as chemical waste. Immediate action was taken by the Contractor.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Date:

19 February 2010

Time:

9:30

Inspection No.:

013

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

The hole on the drip tray underneath an oil drum at Banyan Bridge had been blocked by a stopper. (Closed)

 

 

2.

Oil stains on the ground at Banyan Bridge had been cleared. No oil stain was observed. (Closed)

 

 

 

 

 

 

 

New Observation

 

 

3.

Silt was observed deposited in the u-channel along Bridge 11A to Retaining Wall 10. The Contractor was reminded to clear the u-channel regularly.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Date:

24 February 2010

Time:

9:00

Inspection No.:

014

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The silt accumulated in the u-channel along Bridge 11A to Retaining Wall 10 had been cleared. However, silt was observed deposited inside the u-channel at Bridge 10A pier 2. The Contractor was reminded to clear the u-channel regularly.

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

 

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil