Site
Inspection Summary
Date: |
3 February 2010 |
Time: |
09:00 |
Inspection No.: |
011 |
|
Nil |
|
Follow Up Observation |
|
|
|
Nil |
|
|
|
|
|
|
|
|
|
|
|
New Observation |
|
|
1. |
A
stockpile of stonefine was not properly covered at Wall 8. The Contractor was
reminded to cover the stockpile with tarpaulin sheet. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Date: |
11 February 2010 |
Time: |
14:00 |
Inspection No.: |
012 |
|
Nil |
|
Follow Up Observation |
|
|
1. |
The stockpile of stonefine at Wall 8 had
been covered with tarpaulin. (Closed) |
|
|
|
|
|
|
|
|
|
|
|
New Observations |
|
|
2. |
A
hole was observed on the drip tray underneath an oil drum at Banyan Bridge.
The Contractor was reminded to seal off the hole. |
|
|
3. |
Oil
stains were observed on the top soil layer on the ground at Banyan Bridge.
The Contractor was reminded to clear the oily soil and treat it as chemical
waste. Immediate action was taken by the Contractor. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Date: |
19 February 2010 |
Time: |
9:30 |
Inspection No.: |
013 |
|
Nil |
|
Follow Up Observations |
|
|
1. |
The hole on the drip tray underneath an oil
drum at Banyan Bridge had been blocked by a stopper. (Closed) |
|
|
2. |
Oil
stains on the ground at Banyan Bridge had been cleared. No oil stain was
observed. (Closed) |
|
|
|
|
|
|
|
New Observation |
|
|
3. |
Silt
was observed deposited in the u-channel along Bridge 11A to Retaining Wall
10. The Contractor was reminded to clear the u-channel regularly. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Site
Inspection Summary
Date: |
24 February 2010 |
Time: |
9:00 |
Inspection No.: |
014 |
|
Nil |
|
Follow Up Observation |
|
|
1. |
The silt accumulated in the u-channel along
Bridge 11A to Retaining Wall 10 had been cleared. However, silt was observed
deposited inside the u-channel at Bridge 10A pier 2. The Contractor was
reminded to clear the u-channel regularly. |
|
|
|
|
|
|
|
|
|
|
|
New Observation |
|
|
|
Nil |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |