Site Inspection Summary

 

Inspection Information

Date:

6 January 2010

Time:

9:45

Inspection No.:

007

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

 

Nil

 

 

 

 

 

 

 

New Observations

 

 

1.

Oil stains were observed on the ground near the site entrance of Wall 8. The Contractor was reminded to clear the oil stains and properly maintain the site vehicles to prevent oil seepage.

 

 

2.

Leaves and general refuse were accumulated inside the u-channel at Wall 8 and at TP4 & 5. The Contractor was reminded to clear the u-channel regularly.

 

 

3.

A few retained trees were not properly fenced off at Wall 10. The Contractor was reminded to fence off all retained trees on site.

 

 

4.

Muddy water was found discharged to Tai Po River outside Wall 10. The Contractor was requested to properly maintain the drainage system on site, as well as to closely check the water quality of the discharge to public drains.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Date:

13 January 2010

Time:

14:00

Inspection No.:

008

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

Oil stains on the ground near the site entrance of Wall 8 had been cleared. (Closed)

 

 

2.

Leaves and general refuse inside the u-channel at Wall 8 and at TP4 & 5 had been cleared. (Closed)

 

 

3.

The retained trees at works area of Wall 10 had been fenced off. (Closed)

 

 

4.

Water discharged to Tai Po River outside Wall 10 was observed clear. (Closed)

 

 

 

 

 

New Observations

 

 

 

 

5.

Oil stain was observed on the ground underneath an excavator under maintenance at Wall 8. The Contractor was advised to provide a tarpaulin sheet underneath the excavator.

 

 

6.

Two chemical containers at Wall 10 were not provided with chemical labels. The Contractor was reminded to provide proper labels to all chemical containers on site.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Date:

20 January 2010

Time:

09:00

Inspection No.:

009

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observations

 

 

1.

The excavator under maintenance at Wall 8 had left the site and no oil stain was observed on ground. (Closed)

 

 

2.

The chemical containers at Wall 10 had been provided with proper chemical labels. (Closed)

 

 

 

 

 

 

 

New Observation

 

 

3.

Stagnant water was observed at Wall 10. The Contractor was reminded to spray larvicide oil on the stagnant water to prevent mosquito breeding.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil

 

 


Site Inspection Summary

 

Inspection Information

Date:

27 January 2010

Time:

09:00

Inspection No.:

010

 

Non-compliance

 

 

Nil

 

 

Observations

 

Follow Up Observation

 

 

1.

The pit at Wall 8 was observed dry. No stagnant water was observed. (Closed)

 

 

 

 

 

 

 

 

 

 

 

New Observation

 

 

 

Nil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remarks

 

 

Nil